Showing posts with label ACI Fabric. Show all posts
Showing posts with label ACI Fabric. Show all posts

Tuesday, 28 April 2026

Cisco ACI Leaf Node ID Swap on vPC Pairs: Risks, Precautions, and Step-by-Step Process

Cisco ACI Leaf Node ID Swap Steps When Leaves Are Part of vPC

Step 0 – Preconditions
Confirm maintenance window is approved. Ensure alternate connectivity or downtime is acceptable. Make sure you have console or OOB access to both leaf switches.

Step 1 – Drain Traffic and Clear Endpoints
Shut down or migrate all server-facing interfaces connected to the vPC pair.
From APIC, navigate to Fabric → Inventory → Pod → Node → Leaf → Endpoints.
Verify endpoint count is zero on both leaves.

Step 2 – Remove vPC and Port-Channel Configuration
Delete vPC protection group policies.
Delete all vPC port-channels.
Remove interface policy associations.
Remove all static EPG bindings that reference the vPC or either leaf.
At this stage, the leaves must have no access policy dependencies.

Step 3 – Remove L3Out (If Leaves Are Border Leaves)
If the vPC pair is used for L3Out, remove both leaves from the L3Out logical node profile and logical interface profile.
Confirm external routing is stable via remaining border leaves.

Step 4 – Decommission First Leaf (Leaf A)
In APIC, go to Fabric → Inventory → Fabric Membership.
Select Leaf A and perform Decommission.
Wait until the status shows Decommissioned.
Do not power off yet.

Step 5 – Clean Leaf A
Connect to Leaf A using console or OOB.
Run acidiag touch clean and then reload the switch.
This removes old node ID, certificates, and fabric identity.

Step 6 – Decommission Second Leaf (Leaf B)
In APIC, again go to Fabric → Inventory → Fabric Membership.
Select Leaf B and perform Decommission.
Wait until the status shows Decommissioned.

Step 7 – Clean Leaf B
Connect to Leaf B using console or OOB.
Run acidiag touch clean and reload the switch.
Both leaves are now clean and discovery-ready.

Step 8 – Re-add Leaf A with New Node ID
Power on Leaf A only.
Ensure fabric uplinks to spines are connected.
From APIC Fabric Membership, approve the switch and assign the new desired node ID.
Wait until Leaf A is fully discovered and stable.

Step 9 – Re-add Leaf B with New Node ID
Power on Leaf B.
From APIC Fabric Membership, approve it and assign the other node ID.
Wait until Leaf B is fully discovered and stable.

Step 10 – Rebuild vPC Configuration
After both leaves are healthy, recreate the vPC protection group.
Recreate vPC port-channels and interface policies.
Reapply static EPG bindings to the vPC.
Do not rebuild vPC if only one leaf is active.

Step 11 – Validation
Verify fabric health is green.
Ensure no vPC, access, or infra faults exist.
Confirm port-channels are up on both leaves.

Step 12 – Restore Traffic
Enable server-facing interfaces.
Bring servers or upstream devices back online.
Verify endpoint learning and confirm no MAC flapping or faults.

Final Rule

Never attempt a live node ID swap. Always decommission, clean, and re-add both vPC peer leaves in a controlled sequence.

Precautions

Swapping node IDs between Cisco ACI leaf switches is a sensitive operation, especially when the leaves are configured as a vPC pair. Unlike traditional networks, Cisco ACI tightly binds policies, forwarding state, and infrastructure objects to node IDs, making a node ID swap a planned maintenance activity, not a live change. When vPC is involved, the risk multiplies because both leaves act as a single logical endpoint for servers and network devices.

This article explains the critical precautions you must follow when performing a Cisco ACI leaf node ID swap in a vPC environment, based on real production experience and Cisco‑accepted operational practices.

Why Node ID Swap Is Risky in vPC‑Based ACI Fabrics

In Cisco ACI, a leaf’s node ID is not just an identifier; it is embedded into multiple internal constructs such as vPC identifiers, static EPG bindings, endpoint tables, and forwarding databases. In a vPC pair, both leaves jointly provide forwarding for a single logical port‑channel. Swapping node IDs without proper preparation can cause MAC flapping, endpoint blackholing, broken port‑channels, and fabric faults.

There is no supported in‑place node ID change in Cisco ACI. The only supported method to swap node IDs is to decommission, clean, and re‑add the leaf switches with the desired node IDs.

Precaution 1: Treat the vPC Pair as a Single Failure Domain

The most important rule is to treat both vPC peers as a single unit, even though they are two physical switches. Never attempt a node ID swap on only one vPC peer while the other peer is actively forwarding traffic. ACI vPC forwarding relies on consistent node information across both leaves. Any mismatch can result in unpredictable traffic loss.

Before starting, ensure:

  • All connected servers or upstream devices are drained or shut down.
  • No single‑homed devices depend on the vPC pair.
  • Maintenance is scheduled during a proper change window.

Precaution 2: Ensure Zero Active Endpoints on Both Leaves

A node ID swap must never be performed while endpoints are active. In ACI, endpoints can be learned dynamically through traffic, and their state is tied to the leaf node ID. If endpoints remain on either vPC peer, swapping node IDs will cause immediate disruption.

From APIC, verify that both leaves show zero endpoints before proceeding. If endpoints are present, migrate workloads, shut down interfaces, or disconnect cables until endpoint learning is cleared.

Precaution 3: Remove vPC and Port‑Channel Policies Before Decommissioning

ACI does not automatically clean up vPC policies during decommissioning. All vPC‑related constructs must be removed manually. This includes:

  • vPC protection group
  • Port‑channel policies
  • Interface policy associations
  • Static EPG bindings referencing the vPC

Leaving these objects in place can block decommissioning or result in orphaned configuration that causes faults after the swap. A clean policy removal ensures that the fabric does not retain references to the old node IDs.

Precaution 4: If the vPC Pair Is Also a Border Leaf, Remove L3Out First

When a vPC pair is serving as a border leaf for L3Out, the risk is even higher. External routing protocols such as BGP or OSPF depend on stable leaf identities. Before any node ID swap:

  • Remove the leaves from all L3Out logical node profiles.
  • Ensure routing is fully operational on alternate border leaves.
  • Validate external reachability before continuing.

Failure to do this can result in complete north‑south traffic outages.

Precaution 5: Always Clean Both Leaves Using acidiag

After decommissioning each leaf, it is mandatory to run:

acidiag touch clean
reload

on both vPC peers. Cleaning only one switch is a common and dangerous mistake. If one leaf still retains fabric identity or certificates, the fabric may encounter node ID conflicts, discovery failures, or inconsistent vPC behavior when the switches are re‑added.

Cleaning ensures that the switch boots in a discovery‑ready state with no residual ACI identity.

Precaution 6: Re‑Add Leaves Sequentially, Not in Parallel

When re‑adding switches with swapped node IDs, never power up or approve both leaves at the same time. Always follow a controlled order:

  1. Bring up the first leaf and assign its new node ID.
  2. Wait for full fabric stability and health.
  3. Bring up the second leaf and assign its new node ID.

This approach avoids node ID collisions, partial vPC instantiation, and confusing APIC fault scenarios.

Precaution 7: Rebuild vPC Only After Both Leaves Are Fully Healthy

Do not recreate vPC configurations until both leaves are fully discovered, healthy, and visible in the fabric. Building vPC with only one peer active leads to port‑channel inconsistencies and deployment failures.

Once both leaves are stable:

  • Recreate vPC protection groups.
  • Recreate port‑channels.
  • Reapply static EPG bindings.
  • Validate that both leaves appear in all bindings.

Only after this should server ports or network devices be reconnected.

Precaution 8: Validate vPC Health Before Allowing Traffic

Before reintroducing traffic, perform strict validation:

  • No vPC‑related faults in APIC.
  • Port‑channels show operational status.
  • No access, fabric, or infra faults.
  • Leaf interfaces are up and error‑free.

Once validation is complete, gradually restore server or upstream connectivity and observe endpoint learning behavior.

Common Mistakes to Avoid

The most common mistakes during node ID swap in vPC environments include attempting a live swap, forgetting to remove vPC policies, cleaning only one leaf, or restoring traffic before full validation. Each of these can result in extended outages and complex recovery procedures.

Final Takeaway

A Cisco ACI leaf node ID swap in a vPC environment is a full teardown and rebuild operation, not a minor change. Success depends on treating both leaves as a single unit, removing all dependencies, cleaning both switches, and performing a controlled re‑addition process. When executed correctly, the swap is safe and fully supported, but shortcuts almost always lead to problems.

One‑Line Summary

In Cisco ACI, swapping node IDs on vPC‑connected leaf switches requires full vPC teardown, clean decommissioning of both leaves, and a controlled rebuild to avoid traffic loss and fabric instability.

How to Safely Decommission a Leaf Switch in Cisco ACI — Step-by-Step Guide with Checklist

 Decommissioning a leaf switch in a Cisco ACI fabric is a high‑impact operational activity. Doing it correctly avoids outages, policy corruption, ghost nodes, and rediscovery issues. Doing it incorrectly can result in traffic loss, unresolved faults, and extended downtime.

Many engineers think decommissioning a leaf is as simple as clicking a button in APIC. In reality, Cisco ACI follows a strict dependency and lifecycle model, and a leaf must be carefully prepared before removal.

This blog explains how to decommission a leaf switch from an ACI fabric safely, with real‑world checks, APIC steps, CLI verification, and best practices. It is written for production environments, troubleshooting scenarios, and interviews.


What Does “Decommissioning a Leaf Switch” Mean in ACI?

In Cisco ACI, decommissioning a leaf switch means:

  • Removing the switch from fabric membership
  • Withdrawing all policies and certificates
  • Detaching the switch logically from the fabric control plane
  • Preparing it for power‑off, replacement, or reuse

Decommissioning is a logical operation, not just a hardware action.


Why Proper Decommissioning Is Critical

Incorrect decommissioning can lead to:

  • Traffic outages due to active endpoints
  • Broken vPC or port‑channel configurations
  • L3Out or BGP/OSPF failures
  • “Ghost nodes” still visible in APIC
  • Problems when re‑adding or repurposing the switch

In production data centers, a clean decommission is often part of:

  • Hardware refresh
  • RMA replacement
  • Capacity rebalancing
  • Fabric redesign

Pre‑Decommission Checklist (Very Important)

Before you touch APIC, validate all dependencies. This is where most failures occur.

1. Confirm No Active Endpoints on the Leaf

A leaf with active endpoints must not be decommissioned.

APIC GUI path:

Fabric → Inventory → Pod → Node → Leaf → Endpoints

✅ Endpoint count should be 0

Optional APIC CLI:

Shell
moquery -c fvCEp | grep node-<leaf-id>

If endpoints are present:

  • Migrate workloads
  • Shut down ports
  • Move static bindings

2. Remove Static EPG Bindings

Static path bindings directly tie an EPG to a leaf port.

APIC GUI path:

Tenant → Application Profile → EPG → Static Ports

Remove:

  • Access ports
  • Port‑channels
  • vPC bindings

⚠️ A leaf with static bindings will fail decommission.


3. Handle vPC and Port‑Channels Properly

If the leaf is part of a vPC pair:

  • Remove vPC associations
  • Remove port‑channels
  • Ensure services are moved to the peer leaf

Never decommission one side of an active vPC without cleanup.


4. Check if the Leaf Is a Border Leaf (L3Out)

If the leaf is used for L3Out:

  • Remove it from:
    • Logical Node Profile
    • Logical Interface Profile
  • Ensure routing is functional on alternate border leaves
  • Verify BGP/OSPF is stable

Decommissioning a border leaf without migration can cause external connectivity outages.


Step‑by‑Step: Decommissioning a Leaf Switch from ACI Fabric

Step 1: Verify Fabric Health (Recommended)

Before removing infrastructure components, ensure fabric health is stable.

Fabric → Inventory → Fabric Membership
  • No critical fabric‑wide faults
  • Controllers and spines healthy

This reduces unexpected behavior during changes.


Step 2: Decommission the Leaf from APIC

This is the main and officially supported step.

APIC GUI path:

Fabric → Inventory → Fabric Membership
  1. Select the leaf switch
  2. Click Actions
  3. Choose Decommission
  4. Confirm the action

APIC will:

  • Withdraw policies
  • Remove certificates
  • Update fabric membership state

⏱️ This usually takes 1–2 minutes.


Step 3: Verify Decommission Status

After completion, confirm the state.

APIC GUI:

Fabric → Inventory → Fabric Membership

Leaf should show:

  • Decommissioned or Removed

Optional APIC CLI:

Shell
moquery -c fabricNode | grep <leaf-id>

Step 4 (Optional but Strongly Recommended): Clean the Switch

Once decommissioned, APIC no longer manages the switch.
If the switch will be reused or re‑added, you must clean it locally.

How to Clean the Decommissioned Leaf

Access via:

  • Console
  • OOB management
  • CIMC / KVM (if available)

Run:

Shell
acidiag touch clean
reload

This removes:

  • Fabric certificates
  • Node ID
  • ACI state information

After reboot, the switch will be ready for fresh discovery.


What NOT to Do (Common Mistakes)

MistakeImpact
Decommission with live endpointsTraffic outage
Skip static path cleanupDecommission failure
Forget L3Out dependenciesExternal routing outage
Power off without decommissionGhost node in APIC
Skip cleaning before reuseRediscovery failures

Leaf vs Spine Decommissioning (Quick Comparison)

ItemLeafSpine
Endpoint check required✅ Yes❌ No
Policy dependency cleanup✅ Mandatory❌ Minimal
L3Out impact✅ Possible❌ None
Redundancy consideration✅ Workloads✅ Fabric
Last node restriction❌ Leaf allowed❌ Never remove last spine

Real‑World Decommission Scenarios

Scenario 1: Hardware Refresh

A leaf is replaced due to lifecycle expiry.
Decommission old leaf → clean → rack new leaf → approve membership.

Scenario 2: RMA Replacement

Failed leaf is decommissioned logically, replaced physically, and re‑added with the same or new node ID.

Scenario 3: Fabric Re‑design

Leaf removed as part of capacity reshaping or topology optimization.


Troubleshooting Decommission Failures

If decommission fails:

  • Check for:
    • Active endpoints
    • Static bindings
    • vPC remnants
  • Look at Faults under the leaf
  • Verify no L3Out or service graph references remain

ACI always points to what dependency is blocking the operation.


Interview‑Ready Questions and Answers

Q: How do you decommission a leaf switch in Cisco ACI?
A: Remove all endpoints and policy dependencies, then decommission the leaf from Fabric Membership in APIC.

Q: Can you decommission a leaf with active endpoints?
A: No, endpoints must be removed first.

Q: Why run acidiag touch clean after decommission?
A: To remove fabric identity and prepare the switch for reuse or rediscovery.


Best Practices Summary

  • Always validate endpoints and bindings first
  • Treat border leaves with extra caution
  • Use vPC and redundancy wisely
  • Clean switches before reuse
  • Document node IDs and reasons for decommission

Final One‑Line Summary

In Cisco ACI, a leaf switch must be carefully prepared, cleaned of dependencies, and decommissioned through Fabric Membership in APIC to ensure a safe and outage‑free fabric operation.

Tuesday, 5 August 2025

Concept of vPC in ACI

Concept of vPC in ACI

In Cisco ACI, a Virtual Port Channel (vPC) enables two separate leaf switches to present a unified port channel to a connected endpoint—such as a server, firewall, or another switch that supports link aggregation protocols like LACP.

In this setup, two ACI leaf nodes (e.g., Leaf201 and Leaf202) act as vPC peers, forming a logical construct known as a vPC domain. One of these peers is elected as the primary, while the other assumes the secondary role.




ACI’s MCT-Based Architecture

Unlike traditional vPC implementations that rely on a dedicated peer-link, ACI leverages the fabric itself to manage synchronization and control-plane communication. This architecture is referred to as Multichassis EtherChannel Trunk (MCT).

🔧 Key Characteristics:

  • No physical peer-link is required between Leaf201 and Leaf202.
  • Instead, the ACI fabric handles all peer communication and synchronization.
  • ZMQ (Zero Message Queue) replaces traditional CFS (Cisco Fabric Services) for messaging between vPC peers.

How Peer Communication Works in ACI

  • ZMQ, a high-performance messaging library using TCP, is embedded as libzmq on each switch.
  • Applications that require peer communication (like the vPC manager) use this library to exchange messages.

🔄 Peer Reachability Mechanism:

  • The vPC manager subscribes to routing updates via URIB.
  • When IS-IS discovers a route to the peer (e.g., Leaf202 sees Leaf201), URIB notifies the vPC manager.
  • The manager then attempts to establish a ZMQ socket with the peer.
  • If the route is withdrawn (e.g., due to link failure), the vPC manager is notified and the MCT link is brought down accordingly.

Upgrade Best Practices with vPC

To ensure high availability during fabric upgrades, it's recommended to divide switches into at least two upgrade groups. For example:

  • Group A: Leaf201, Leaf203, Spine101
  • Group B: Leaf202, Leaf204, Spine102

This strategy ensures that at least one vPC peer remains active during the upgrade, preventing service disruption for connected endpoints.


Glossary

Term

Description

ACI

Application Centric Infrastructure

vPC

Virtual Port Channel

MCT

Multichassis EtherChannel Trunk

ZMQ

Zero Message Queue

URIB

Unicast Routing Information Base

IS-IS

Intermediate System to Intermediate System

LACP

Link Aggregation Control Protocol


 VPC Design Options:-

Option 1 -VPC with SAME Leaf interfaces across two leafs with Combined Profiles



Option 2 -  VPC with SAME Leaf interfaces across two leafs with Individual Profiles.




Option 3 -  VPC with DIFFERENT Leaf interfaces across two leafs with Individual Profiles





Monday, 4 August 2025

Complete Steps to Create vPC in Cisco ACI (via APIC GUI)

 Understanding vPC in Cisco ACI: A Modern Approach to High Availability

In the evolving landscape of data center networking, Virtual Port Channel (vPC) stands out as a cornerstone of high availability and link redundancy. While traditional NX-OS environments rely on CLI-driven configurations, Cisco ACI reimagines vPC through a policy-driven, intent-based model that aligns with the fabric’s overarching design philosophy.

Unlike legacy setups, ACI abstracts physical connectivity into logical constructs, allowing administrators to define vPC behavior through interface policy groups, switch profiles, and attachable access entity profiles (AAEPs). This not only simplifies deployment but also ensures consistency across the fabric.

At its core, a vPC in ACI enables two leaf switches to present a unified uplink to a downstream device—be it a server, firewall, or load balancer—without relying on spanning tree protocols. The result is active-active forwarding, improved bandwidth utilization, and seamless failover.

In this guide, we’ll walk through the step-by-step configuration of vPC in Cisco ACI, demystifying each component and highlighting best practices to ensure a robust and scalable deployment.

Note:- In Cisco ACI, a Fabric Extender (FEX) can be integrated using a port channel in a straight-through topology, where each FEX connects directly to a leaf switch. While vPCs can be established between hosts and the FEX for redundancy and load balancing, the FEX itself does not support vPC connectivity to multiple leaf switches.

 Complete Steps to Create vPC in Cisco ACI (via APIC GUI)

Step 1: Leaf Onboarding (One-by-One)

🔍 Monitor Discovery in APIC

  1. Log in to the APIC GUI
  2. Navigate to:
    Fabric → Inventory → Fabric Membership → Nodes Pending Registration
  3. Wait for Leaf101 to appear
    • You’ll see its Serial Number
    • Node Role: Leaf
    • Status: Blank / Not Registered

📝 Register Leaf101

  1. Right-click on Leaf101’s serial number
  2. Click Register
  3. In the registration window, enter:
    • Node ID: 101
    • Node Name: Leaf101
    • Click Register
    • Wait for it to appear in Registered Nodes

📝 Register Leaf102

  1. Repeat the same steps for Leaf102:
    • Wait for it to appear in Nodes Pending Registration
    • Right-click → Register
    • Enter:
      • Node ID: 102
      • Node Name: Leaf102
    • Click Register
    • Wait for it to appear in Registered Nodes

🔢 Step-by-Step ACI Configuration Flow

2. VLAN Pool (VLAN 113)

  • Navigate to:
    Fabric → Access Policies → Pools → Right Click on VLAN and click Create Vlan Pool
  • Create VLAN Pool:
    • Name: VLAN_113_Pool
    • Mode: Static
    • Click + under Encap Blocks

Ø  Range:  113 – 113

Ø  Allocation mode: Static

    • Click Ok - >Submit

3. Domain (Physical Domain)

  • Go to:
    Fabric → Access Policies → Physical and External Domains ->Right Click on Physical domain ->
  • Create Physical Domain:
    • Name: PhysDom_VLAN113
    • VLAN Pool: VLAN_113_Pool
    • Click Submit

4. AEP (Attachable Access Entity Profile)

  • Navigate to:
    Fabric → Access Policies → Policies-> Global → Right Click on Attachable Access Entity Profiles -> Click Create Attachable Access Entity Profiles
  • Create AEP:
    • Name: AEP_VLAN113
    • Click + under Domains and Associated Domain: PhysDom_VLAN113
    • Click Update ->Next -> Finish

5. Interface Policy Group (vPC)

  • Go to:
    Fabric → Access Policies → Interface → Leaf Interfaces - >Policy Groups->Right click on VPC Interfaces - >Create VPC Interfaces
  • Create VPC Interface Policy Group:
    • Name:  vPC_LF101_LF102_1_1
    • AEP: AEP_VLAN113
    • Port Channel Policy: system-lacp-Active
    • Link Level Policy: system-link-level-XG-Auto
  • Click Next > Finish

6. Create vPC Policy (Your Mentioned Step)

  • Go to:
    Fabric → Access Policies → Policies → Switch
  • Right-click on Virtual Port Channel Default

Name:VPC_101_102

ID:10

VPC Domain Policy: Default

Switch1: Leaf101

Switch2: Leaf102

This step ensures the vPC behavior is defined at the switch policy level.

7. Interface Profile

  • Navigate to:
    Fabric → Access Policies → Interface → Leaf Interface -> Profiles
  • Right click on the interface profile and click Create Interface Profile:
    • Name: IntProf_Leaf101_102
  • Click + under Interface Selector:
    • Name: Eth1_4
    • Interface ID: 1/4
    • Policy Group: vPC_LF101_LF102_1_1
  • Click Ok - > Submit

 

8. Switch Profile

  • Go to:
    Fabric → Access Policies → Switches → Profiles
  • Right Click on Profile and click Create Leaf Profile:
    • Name: LeafProf_101_102
  • Click + under Leaf Selector:
    • Name: Leaf101_102
    • Node Block: From 101 to 102
  • Click Update -> Next
  • Attach Interface Profile:
    • IntProf_Leaf101_102

9. Create Tenant

  • Navigate to:
    Tenants
  • Click Add Tenant
    • Name: Tenant_WebApp
  • Click Submit

10. Create VRF

  • Navigate to:
    Tenants
  • Click Networking -> VRF -> Right click on VRF -> click Create VRF
    • Name: WebApp_VRF
    • Uncheck Create A Bridge Domain
  • Click Finish

11 Create BD

  • Navigate to:
    Tenants
  • Click Networking -> Bridge Domain -> Right click on Bridge Domain-> click Create Bridge Domain
    • Name: WebApp_BD
    • VRF: WebApp_VRF
    • Click Next
    • Click + under Subnet

Ø  Gateway IP: 10.1.1.1/24

Ø  Check “Make this IP address Primary”

Ø  Scope: check “Advertised Externally”

  • Click OK -> Next-> Finish

 

12. Create Application Profile (AP)

  • Inside Tenant_WebApp, go to:
    Application Profiles
  • Right Click on Application Profile  and Create Application Profile:
    • Name: WebApp_AP
  • Click Submit

13. Create Endpoint Group (EPG)

  • Inside WebApp_AP, go to:
    EPGs
  • Right Click on Application EPG and click Create Application EPG:
    • Name: WebApp_EPG
    • Bridge Domain: WebApp_BD
    • Click Finish
  • Right Click on WebApp_EPG and click ADD Physical Domain Association:
    • Domain Association: PhysDom_VLAN113
    • Click Submit

14. Create Contract (Allow TCP Port 80)

  • Go to:
    Tenant_WebApp → Contracts -> Standard
  • Right Click on Standard -> Click Create Contract:
    • Name: Allow_HTTP
  • Click + under Subject:
    • Name: HTTP_Subject
    • Filter: Click + under Filter
      • Click + Under Name
      • Name: HTTP_Filter
      • Click + under Entries
      • Name: HTTP_Entry
      • EtherType: IP
      • IP Protocol: TCP
      • Destination Port: From http – To http
      • Click Update-> Submit
      • Click Update -> Ok -> Submit
  • Provide contract to/from EPG as needed

15. Static Binding of EPG to Port

  • Go to Tenant WebApp_EPG-> Application Profiles -> WebApp_AP ->  Application EPGs -> WebApp_EPGs
  • Right Click on WebApp_EPGs -> Click Deploy Static EPG on PC,VPC, or Interface
    • Path Type: Virtual Port Channel
    •  Path: Leaf101/eth1/4 and Leaf102/eth1/4
    • Mode: Trunk
    • Encapsulation: vlan-113