Saturday, 6 September 2014

Migration from FAB- 1 to FAB-2 in 7000 Nexus switch

Before thinking to migrate the Fabric module please check the data sheets for both fabric modules in order to compare their features and limitations.

Please use the below link to check the difference between FAB-1 and FAB-2.


Fabric cards can be replaced one by one without any disruption. Both cards can work well together but it is not recommended for longer time.


If all Fabric modules are not replaced within 12 hour of the first card installation then switch will generate the syslog warning messages to complete the migration.



No comments:

Post a Comment